Browsing Tag: 787-8

United's Boeing 787 Dreamliner in Houston. Photo: Brandon Farris

United’s Boeing 787 Dreamliner in Houston. Photo: Brandon Farris

It has been a long journey, but I am proud to say that I have finally flown on a Dreamliner.

After two years of trying to get on the 787-8 Dreamliner, I finally had my opportunity to step aboard one of the most amazing aircraft ever built.My flight, United 1169, was from Houston to Los Angeles; they fly the aircraft once a day between these cities for positioning, and when I stumbled on it I couldn’t resist.

As time call to board my flight (in the Economy Plus section), it finally began to sink in that I was about to board the plane I have lost many nights of sleep over. I have followed the issues the plane has had throughout its flight test program and entry into service.

The aircraft I was flying on, N26902, has quite a history and actually is one of the 787s that cost me a couple night’s sleep, as it was the plane that diverted to New Orleans back in December, 2012, when the battery saga was beginning to catch fire. The aircraft also completed the inaugural flights for United to Tokyo Narita from Los Angeles, becoming the first 787 flown by a non-Japanese airline to land in Japan.  Weeks later, it completed United’s first flight to Shanghai.

Boeing employees work on the first 787-9 horizontal stabilizer. Photo by Matthew Thompson / Boeing.

Boeing employees work on the first 787-9 horizontal stabilizer. Photos by Matthew Thompson / Boeing.

The first horizontal stabilizer for the first Boeing 787-9 Dreamliner has arrived to Paine Field — early. The new version of the Dreamliner will seat 40 additional passengers and be able to fly 8000-8500 nautical miles.

Boeing expects that the first 787-9 will go into final assembly by mid 2013, first flight will occur during the second half of 2013, it will be delivered to Air New Zealand in early 2014 and start flying passengers in mid 2014.