Browsing Tag: Renton Factory

On December 2, 1996: The first 737NG, a 737-700, rolls out of the Renton factory to all splashy event. On December 17, 1997 Boeing delivered the first Next-Generation 737-700 to launch customer Southwest Airlines. The 737-700 is the 2nd best selling 737NG behind the -800 but the -900 has picked up momentum. Image courtesy: Boeing

On December 2, 1996: The first 737NG, a 737-700, rolls out of the Renton factory to all splashy event. Image courtesy: Boeing

This story was written by Chris Sloan and originally was published on Airchive.com. This is the next of a multi-part series talking about the Boeing 737 factory in Renton. Read the first part: A Historical Look at Boeing’s 737 Factory in Renton.

Success Breeds Competition: The Airbus A320 ups the ante and Boeing is forced to answer

In 1988, the first serious competitor to the 737 monopoly, the Airbus A320 entered service. With even more advanced systems like fly-by-wire flight controls, new higher powered and fuel efficient engines, a wider cabin, the first major use of composite materials in a narrow body airliner, and somewhat larger capacity on a direct model comparison basis, the A320 family quickly became a force to be reckoned with. In addition, Airbus offered aggressive pricing and quicker delivery windows. Having only recently launched the 2nd generation 737s, Boeing didn’t respond to the European framer’s challenge for another 5 years.

In 1993, Boeing finally answered with the Boeing 737 Next Generation. First flying in 1997, it first entered service in 1998 as a 737-700 (comparable in size to the 737-300) for launch customer Southwest. While retaining commonality with the 2nd generation 737s, the NextGens included a redesigned wing, and eventually winglets, that increased total fuel capacity by 30% and range to over 3,000 miles. Quieter, more powerful and more fuel-efficient engines in the form of CFM56-7Bs came online as well.

Outside the Boeing 737 Factory in Renton, WA. Photo by Chris Sloan / Airchive.com.

Outside the Boeing 737 Factory in Renton, WA. Photo by Chris Sloan / Airchive.com.

This story was written by Chris Sloan and originally was published on Airchive.com. This is the first of a multi-part series looking at the Boeing 737 factory in Renton.

On the evening of March 18, 2013 Boeing’s Renton Plant rolled out its first Boeing 737, a 737-800 bound for Panamanian Airline COPA, at the astounding new production rate of 38 aircraft per month. Boeing had only reached 35 airplanes per month, its previous historic high commercial production rate in January 2012. 2 days later on March 20, 2013, Boeing delivered the 7500th 737, the 7,229nd example built at Renton (more on this later). By Spring 2014, the rate is expected to leap to 42 aircraft per month.

In 2015, Renton will begin production of the new 737 MAX that is due to enter commercial service in 2017, 50 years after the 737 first entered service in 1967! The Boeing 737 is the best-selling and longest continuously produced commercial airliner of all time with over 10,500 deliveries and orders. As of April, 2013 between the new Max (1,234) and current the Next-Generation (4,395), the 737 backlog stands at 3,136 aircraft. With the increased production rates, the current order book will take 6 ½ years alone to clear. Boeing’s current market outlook estimates 23,000 new narrow body airliner orders in the 737 / A320 families category over the next 20 years. Three draw dropping data-points stand out:

  • 40% of the world’s jetliner fleet has been manufactured at Renton.
  • Renton has produced an astonishing total of over 15,000 aircraft making it one of the most prolific aircraft factories, and the most prolific jetliner factory in history.
  • With approximately 5,600 737s in service, 25% of the world’s large jet fleet (non RJ) are Boeing 737s.