The heavy-lift transport system that will haul the pre-assembled bridge down SEA's center runway on the night of Jan. 23 for installation at the main terminal.

The heavy-lift transport system that will haul the pre-assembled bridge down SEA’s center runway on the night of Jan. 23 for installation at the main terminal.

ASSOCIATE EDITOR - SEATTLE, WA Francis Zera is a Seattle-based architectural, aerial, aviation, and commercial photographer, a freelance photojournalist, and a confirmed AvGeek.

http://www.zeraphoto.com

Leave a Reply

Your email address will not be published. Required fields are marked *